Making an environmental protection project (Water & Wastewater Treatment Plants)
The objects must making an environmental protection project:
Enterprises of production, trading & service, industrial zones, residence areas, urban areas, factories, hospitals, hotels...that already on operation, but not having an approval decision of report on environmental impact assessment or certification paper of an environmental protection commitment.
Work description:
■ |
Surveying, collecting the datas about the current activities of production - trading enterprise. |
|
■ |
Surveying, collecting the datas about the current environment at the surrounding area of the enterprise. |
■ |
Surveying the condition of nature & economy - society concerning the activities of trading-production enterprise. |
|
■ |
Determining the pollution sources of project such as: exhaust fumes, wastewater, solid waste, noise; determining arising wastes during project construction & operation by the ways of statistic, analysis, collection, quick evaluation. |
|
■ |
Taking a sample of water, air & soil at the project area then analyzing at the LAB. |
|
■ |
Determining the impact level of pollution sources to the fators of resource & environment. |
|
■ |
Listing & evaluating general solutions, project articles of environmental protection that executed. |
|
■ |
Building up the methods to reduce pollution, methods to manage environment during project operation and providing against environmental troubles for the oustanding articles. |
|
■ |
Proposing the solution for wastewater treatment, exhaust fumes, the solution for collecting & treating solid waste from project execution. |
|
■ |
Bulding up the program of environmental manage & supervision. |
|
■ |
Preparing official dispatch, dossier for project approval. |
|
■ |
Organizing assembly to examine the environmental protection solution at the company. |
|
■ |
Appraising & issuing the aproval decision. |